20
21
22
23
24
Connect the volt meter between the E lead and ground
at the 66-type block for the tie line being tested.
> If the voltage
is 0 volts, go to step 21.
> If the voltage
is not 0 volts, go to step 19.
Select the tie line
being tested and go off-hook
station A.
Reconnect the volt meter between the M lead and
ground at the 66 type block
NOTE: This measurement must be made within 5
seconds after going off-hook.
> If the voltage is 0 volts, go on to step 23.
> If the voltage is not 0 volts, go to step 19.
Connect a craft set between leads T1 and R1. Select
the tie line being tested using station A. The receiving
end should provide dial tone.
NOTE: The tie line dial tone option should be
administered for remote in order to send dial
tone out to the port being tested.
> If you hear dial tone and can break it, go to step 8
and select the next tie line for testing.
> If you hear dial tone and cannot break it go to step
24.
> If you do not hear dial tone, go to step 19.
Connect a craft set between leads T and R. Select the
tie line being tested using station B. The transmitting
end should provide dial tone.
> If you hear dial tone and can break it, go to step 8
and select the next tie line for testing.
> If you do not hear dial tone, or you hear dial tone
and cannot break it go to step 19.
4-22 Tie Line Troubleshooting
Содержание administration and
Страница 1: ...AT T 518 600 016 MERLIN II COMMUNICATIONS SYSTEM Installation Administration and Maintenance Manual ...
Страница 40: ...FIGURE 1 9 System architecture Theory of Operation 1 37 ...
Страница 175: ...Top cover Front cover FIGURE 2 27 Control unit covers Testing the System 2 107 ...
Страница 177: ...Top cover E m p t y m o d u l e FIGURE 2 28 Installing the control unit top cover Testing the System 2 109 ...
Страница 179: ...Front cover E m p t y module FIGURE 2 29 Installing the control unit front cover Testing the System 2 111 ...
Страница 211: ...FIGURE 3 I A MERLIN II System Display Console The Administrator Attendant Console 3 3 ...
Страница 213: ... FIGURE 3 2 A BIS 34D Console The Administrator Attendant Console 3 5 ...
Страница 217: ...1 1 FIGURE 3 3 Administration Menu for MERLIN II System Release 3 The Administrator Attendant Console 3 9 ...
Страница 218: ...t FIGURE 3 4 Administration Menu for MERIJN II System with Feature Module 2 3 10 The Administrator Attendant Console ...
Страница 331: ...General Tests 4 55 Reaming the Control Unit 4 55 Testing Outside Lines 4 56 ...
Страница 389: ...Section 5 Ordering Information Ordering Information 5 1 Product Listing 5 1 Ordering Information 5 1 ...