![AT&T 4 ESS Скачать руководство пользователя страница 212](http://html1.mh-extra.com/html/atandt/4-ess/4-ess_manual_2994836212.webp)
oscillator being installed
[TABLE B]
and
POWER INPUT P18
and
P19
connectors and
D/A INPUT/OUTPUT
RF output cable
P13
)
connector
J20
(do not connect
RMV:NCLK 0,OSC
a!
AND
[TABLE B]
(a = oscillator installed)
FUSE LOCATION
OSCILLATORS
39B
AND
BAY
HMP
07
07
07
07
INSTALL 39B OSCILLATOR
star washers to hold oscillator
on bottom of new oscillator
to oscillator mounting plate
0
1
1
0
star washers holding oscillator
to oscillator mounting plate
[20] At TTY, enter
[19] Install the 24-volt fuse
[18] Connect
FREQ CONTROL INPUT P21
[17] 24 volt fuse for the
TABLE B
FUSES
0B0A
0B0B
1B0A
1B0B
mounting plate to frame
and retain rubber washers
holes on bottom of new
OSCILLATOR
[10] Remove screws holding oscillator
[11] Align rubber washers with screw
[12] Place oscillator mounting plate
[13] Install and tighten screws with
[14] Place oscillator in network clock
[15] Install and tighten screws with
GROUND
STRAPS
Frame
INPUT, OUTPUT
CONNECTORS
AND POWER
CABLES
CLOCK
CHAIN
0
1
2
3
LOCATION
033-21
033-56
133-21
133-56
oscillator
Figure 1 — Network Clock
frame [Figure 1]
[16] Connect ground strap from
frame upright to oscillator
[Figure 1]
DLP
234-151-013
519
Issue 8
DEC 1995
PAGE 2 of 3