![AT&T 4 ESS Скачать руководство пользователя страница 208](http://html1.mh-extra.com/html/atandt/4-ess/4-ess_manual_2994836208.webp)
REPLACE PHASE METER OR PHASE LOCK OVEN TEMP METER
[11] Solder leads to their
[12] Remove solder drop cloth from
network clock frame
[13] At front of frame, install network
clock chain control cover and
[14] At rear of frame, install six
panhead screws holding rear of
network clock chain control
cover
replaced, wait 15 minutes
before restoring chain to
service
CLOCK
CHAIN
0
1
2
3
corresponding positions on new
soldering iron, and remove tags
meter using grounded-tip
[17] If
PHASE LOCK OVEN TEMP
meter
PHASE
OVEN
PHASE
OVEN
PHASE
OVEN
PHASE
OVEN
switch for 2 seconds
[16] Depress and hold
ON
goes off
PWR OFF
lamp
and tighten four meter mounting
[15] Replace fuse removed in Step 3, Page 1
AND
AND
TABLE B
METER
FUSE
LOCATION
009-32
007-45
009-39
007-32
109-32
107-45
109-39
107-32
BC
B9
BD
A10
BC
B9
BD
A10
retaining screws [Figure 1, Page 1]
[10] Holding new meter in place, install
DLP
PAGE 2 of 2
234-151-013
516
Issue 8
DEC 1995