18
Technical description
Standard boiler
Boiler transport
Boiler installation
Component dimensions
Standard boiler
A boiler delivery package contains the
following components:
Component
Pcs.
Package
Completely assembled and tested boiler
1
In cardboard box
Mounting rail
1
In boiler packaging
Installation manual XL
-
F
1
In document bag in boiler packaging
ERP label (only XL
-
F 60
-
70)
1
Condense pipe
1
Boiler transport
The XL
-
F boiler will be suplied as a fully equipped compact appliance, which has been pre
-
set and tested. The dimensions
of the packaging are : 60,70,100,120,140,170,200:800 x 1200 x 750 mm (W x H x D).
This makes it possible to transport all models in one piece through a normal door.The boiler can be picked up or from the
front with a forklift truck for transport.Unpacking instructions are printed on the carboard box. Please follow the proposed
steps.
Boiler Installation
The installation location of the CH
-
boiler(s) has to be, and remain, frost
-
free. It is NOT necessary to have a purpose provided
air vent providing a twin pipe or concentric room sealed flue system is used in the room or internal space in which the boiler
is installed. Neither is it necessary to ventilate the compartment in which the boiler is installed, due to the extremely low
surface temperature of the boiler casing during operation. The floor has to be flat and level and have sufficient deadweight
capacity for the complete(filled)installation.
When positioning the boiler, please
note the recommended minimum
clearance in the picture. When the
boiler is positioned with less free
space, maintenance activities will be
more difficult.
If you have opted to build the
hydraulic part yourself, then ATAG
recommends using
“
Connection set
XL
-
F as single boiler
”
for each
boiler.
Содержание XL-F 105
Страница 2: ...2...
Страница 25: ...25 Technical description Declaration of conformity...
Страница 41: ...41 Boiler installation Electrical connection...
Страница 42: ...42 Boiler installation Electrical connection...
Страница 49: ...49 Boiler installation Electrical connection Cascade control...
Страница 65: ...65 Accessories Hydraulics Single boiler Dimensional sketch for 3905173 LLH dT10 20K FLOOR STANDING TLPLUS...
Страница 69: ...69 Accessories Hydraulics Single boiler Dimensional sketch for Back pack LLH kits 3905171 and 3905172...
Страница 71: ...71 Accessories Hydraulics Single boiler Dimensional sketch for Back pack PHE kits...