24
Technical description
Clearances
1. Boiler return connection
2. Boiler flow connection
3. Condensate drain
4. Gas
5. Flue gas outlet
6. Air supply
Pay attention to the minimum distance required between the
boilers, walls and ceiling for installing and removing the hou-
sing.
If you have opted to build the hydraulic part yourself, then
ATAG recommends using
“
Connection set XL
-
F as single
boiler
”
for each boiler
.
Содержание XL-F 105
Страница 2: ...2...
Страница 25: ...25 Technical description Declaration of conformity...
Страница 41: ...41 Boiler installation Electrical connection...
Страница 42: ...42 Boiler installation Electrical connection...
Страница 49: ...49 Boiler installation Electrical connection Cascade control...
Страница 65: ...65 Accessories Hydraulics Single boiler Dimensional sketch for 3905173 LLH dT10 20K FLOOR STANDING TLPLUS...
Страница 69: ...69 Accessories Hydraulics Single boiler Dimensional sketch for Back pack LLH kits 3905171 and 3905172...
Страница 71: ...71 Accessories Hydraulics Single boiler Dimensional sketch for Back pack PHE kits...