55
Standard Schemes
ATAG XL
-
F + 1 Mixing c1 Direct c Domestic Hot Water +Low loss header
Electrical connections
A :
Main power supply (230V @50Hz)
B :
Clip In power (230V @50Hz)
Ch.P :
DHW Charging pump(
230/120 VAC, 1A
max)
CP:
DHW re
-
circulating pump (
230 VAC, 2A max)
T10:
Common flow temperature sensor (10K
Ω )
C:
DHW re
-
circulating temperature sensor(10K
Ω )
T3:
DHW temperature sensor(10K
Ω )
D :
Clip
-
In 3 zone
RT1:
Room thermostat (On/Off )
RT2:
Room thermostat (On/Off )
T7 :
Outdoor sensor (optional)(1K
Ω )
A :
Mixing Valve HC2
B :
Heating circuit pump HC1
C :
Heating circuit pump HC2
D:
Flow sensor HC2
E:
Clip In connection to boiler Ebus Input
F:
DIP
-
switch 2 must be set in ON position
G:
Main power connection to boiler board
BOILER MOTHERBOARD
CLIP
-
IN ZONE MANAGER
Содержание XL-F 105
Страница 2: ...2...
Страница 25: ...25 Technical description Declaration of conformity...
Страница 41: ...41 Boiler installation Electrical connection...
Страница 42: ...42 Boiler installation Electrical connection...
Страница 49: ...49 Boiler installation Electrical connection Cascade control...
Страница 65: ...65 Accessories Hydraulics Single boiler Dimensional sketch for 3905173 LLH dT10 20K FLOOR STANDING TLPLUS...
Страница 69: ...69 Accessories Hydraulics Single boiler Dimensional sketch for Back pack LLH kits 3905171 and 3905172...
Страница 71: ...71 Accessories Hydraulics Single boiler Dimensional sketch for Back pack PHE kits...