background image

iSteel is capable of delivering over 50 litres per minute when connected to a suitable mains supply. The high quality inlet 
control  set  with  its  3  bar  operating  pressure  has  been  designed  to  make  the  most  of  what  is  available  however  the 
performance of any unvented system is only as good as the water supply. 
 
In unvented systems both hot and cold services are supplied simultaneously from the mains so the maximum possible 
on-site water demand must be assessed and the water supply should be tested to ensure it can meet these requirements. 
If necessary consult the local water supplier regarding the likely pressure and flow rate availability. 
 
It  is  important  that  site  pressure  readings  are  taken  under  dynamic  flow  conditions,  high  pressures  under  zero  flow 
conditions are not necessarily indicative of satisfactory performance. A minimum of 1.5 bar at 20 l/m flow should be 
available. Where mains inlet pressures are likely to exceed 16 bar then an additional upstream pressure reducing device 
should be fitted. 
 
A minimum of 22mm supply pipe-work should ideally be provided and existing 1/2” (15mm) cold mains pipe-work may 
need to be upgraded. Hard water treatment should be considered in areas where content it greater than 200ppm, if 
required adjust cylinder temperature to below 60 degrees. 

 SITING THE UNIT 

iSteel can be positioned more or less anywhere in the dwelling but it should be remembered that for every 1 metre that 
an outlet is above the iSteel, the pressure will be reduced by 0.1 bar. If siting outside the heated envelope of the dwelling 
such as in a garage or outbuilding then frost protection should be provided and exposed pipework should be insulated. 
 
iSteel  must  be  supported  on  a  flat  base  capable  of  supporting  the  weight  of  the  cylinder  when  full.  The  minimum 
recommended cupboard size is 650mm square. 
 
It’s important that consideration is given to access for maintenance of the valves. The immersion heaters are 375 mm 
long and access space should be provided for possible future replacement, also adequate access to remove and re-install 
the cylinder in the event of a problem. 

 SCHEMATIC 

 
 

 

Содержание iSteel 120

Страница 1: ...iSteel INSTALLATION MANUAL ISSUE 2015 V1 FOR MORE INFORMATION GO TO www atagheating co uk...

Страница 2: ...eir G3 unvented qualification The installation of this product is also notifiable under the national Building Regulations ONCE COMPLETED THIS INSTRUCTION MANUAL IN ITS ENTIRETY SHOULD BE LEFT WITH THE...

Страница 3: ...ditional upstream pressure reducing device should be fitted A minimum of 22mm supply pipe work should ideally be provided and existing 1 2 15mm cold mains pipe work may need to be upgraded Hard water...

Страница 4: ...e Sealed or vented primary circuits can be used to comply with normal installation practice the primary pressure should not exceed 3 bar although the coil in the iSteel is suitable for up to 7 bar if...

Страница 5: ...nd maintenance of services supplying water for domestic use within buildings and their curtilages Have a vertical section of pipe at least 300mm long below the tundish before any elbows or bends in th...

Страница 6: ...the solar heat source Either primary coil connection may be used for flow or return The solar cylinder sensor supplied is inserted into the lower thermostat pocket and the energy cut out into the upp...

Страница 7: ...6 N 3 Port Mid Position E HTG ON DHW ON DHW OFF L N E SL 1 2 3 1 2 3 L N E N L N E 2 3 2 Port Heating Cutout combined Duostat 2 Port DHW PUMP Wiring Centre Room Stat Programmer Boiler G Grey Bl Blue...

Страница 8: ...your discharge pipework is free from debris and is carrying the water away without spillage over the tundish and release the valves and check that they re seat properly GENERAL Servicing should only...

Страница 9: ...ou have a problem in the first year contact the plumber who fitted the unit Thereafter contact the plumber who carries out the annual servicing for you If your iSteel develops a leak we will supply yo...

Страница 10: ...n of the boiler and its controls EXPANSION VESSEL Symptoms Possible causes Follow up action Discharge of water from the relief valve Expansion Vessel is too small Vessel needs resizing and installatio...

Страница 11: ...INLET CONTROL GROUP Fault Finding Information...

Страница 12: ...TUNDISH Fault Finding Information...

Страница 13: ...T P RELIEF VALVE Fault Finding Information...

Страница 14: ...DUAL THERMOSTAT Fault Finding Information...

Страница 15: ...IMMERSION HEATER Fault Finding Information...

Страница 16: ...ENERGY CUT OUT Fault Finding Information...

Страница 17: ......

Страница 18: ......

Страница 19: ...to third parties in the normal course of business In this respect the Buyer shall act in the capacity of the Companies commission agent and the proceeds of such sale 6 6 1 shall be held in trust for u...

Страница 20: ...ary Pressure Indirect Only 3 Bar Cylinder Data Table Capacity Weight Kg Empty iSteel 90 Direct 90 21 Indirect 88 27 iSteel 120 Direct 120 25 Indirect 118 31 iSteel 150 Direct 150 30 Indirect 148 35 Tw...

Отзывы: