background image

 GENERAL INSTALLATION 

 

 COLD MAINS PIPEWORK 

Run the cold main through the building to the place where the iSteel is to be installed. Take care not to run the cold pipe 
near hot water or heating pipe work so that the heat pick up is minimised. Identify the cold water supply pipe and fit an 
isolating valve (not supplied). 
 
A 22mm BS1010 stopcock can typically be used but a 22mm quarter turn full bore valve would be better as it does not 
restrict the flow as much. Do not use “screwdriver slot” or similar valves. 
 
Make the connection to the cold feed of the cylinder and incorporate a drain valve. Position the inlet control just ABOVE 
the Temperature & Pressure Relief Valve (TPRV) mounted on the side of the cylinder. This ensures that the cylinder does 
not have to be drained down in order to service the inlet control set. Ensure that the arrow points in the direction of the 
water flow. 
 
Select a suitable position for the expansion vessel. Mount it to the wall using the bracket provided. Use the compression 
connection supplied to connect the vessel into the cold water pipe adjacent to the cold feed point on the cylinder. There 
must be no obstruction or flow restriction between the cylinder and the expansion vessel. 

 BALANCED COLD CONNECTION 

If there are to be showers, bidets or mono-bloc taps in the installation then a balanced cold supply is necessary. There is 
a 22mm balanced connection on the inlet control set. All outlets in the house will be at 3 bar and thus automatically 
balanced. 

 HOT WATER PIPEWORK 

Run the first part of the hot water distribution pipework in 22mm. This can be reduced to 15mm and 10mm as appropriate 
for the type of tap etc. Your aim should be to reduce the volume of the hot draw off pipework to a practical minimum so 
that the time taken for the hot water is as quick as possible. 
 
Do not use mono-bloc mixer tap or showers if the balanced cold connection is not provided, the unit will back pressurise 
and result in discharge. Ensure that the top of the vessel is accessible for servicing. 

 PRIMARY COIL CONNECTIONS (INDIRECT ONLY) 

Compression connections are provided for the primary circuit which must be positively pumped. Primary flow and return 
connections are interchangeable to suit site conditions without affecting reheat times. These connections are metric and 
should be changed by the installer if using Irish size copper tube.  
 
Sealed or vented primary circuits can be used, to comply with normal installation practice the primary pressure should 
not exceed  3 bar although the coil in the iSteel is suitable for up to 7 bar if required. The boiler may be Gas, Electric, and 
Oil etc. but must be under effective thermostatic control. Uncontrolled heat sources such as some AGA’s, back boilers, 
solid fuel stoves, etc. may not be suitable please contact us for guidance. The two port zone valve should be installed into 
the primary flow pipework leading to the coil flow inlet. The direction of flow arrow should be towards the primary flow 
connection. On twin coil cylinders an extra thermostat boss is provided. 

 SECONDARY CIRCULATION 

Where secondary circulation is required a circulator suitable for potable water should be used in conjunction with a non-
return  valve  to  prevent  backflow.  It  may  be  necessary  to  incorporate  an  extra  expansion  vessel  into  the  circuit  to 
accommodate  the  increased  system  water  volume  in  larger  secondary  circulation  systems.  Where  off  peak  electrical 
tariffs are being used then secondary circulation should be avoided. A secondary return boss is fitted as standard on 210, 
250 & 300L. On smaller sizes tee into the cold feed pipe above the drain. 

 IMMERSION HEATERS 

As a requirement of Building Regulations the iSteel immersion heaters are fitted with thermal cut-out in addition to the 
normal control thermostat. To help ensure correct replacement the immersion heaters have a special 1¾" thread. They 
are of a low noise Incoloy construction and rated at 3 kW at 240 V.  Replacement immersion heaters should be purchased 
via ourselves otherwise your guarantee may be affected. For commercial / heavy duty installations where constant usage 
/ reheat is required Titanium immersion heaters must be fitted in order to comply with the warranty.  
 
The ‘O’- ring on the head of the immersion heater should be correctly positioned and lubricated before fitting. Screw in 
hand-tight until almost sealed then gently tighten as the ‘O’ rings will seal easily. The electrical supply to each immersion 
heater/s must be fused at 13A via a double pole isolating switch to BS 3456. The cable must be 2.5mm

2

 heat resistant 

(85°C HOFR) sheathed flex complying to BS 6141:1981 Table 8. Do not operate the immersion heater/s until the unit is 
full of water. If any sterilisation liquid is in the cylinder do not operate the immersion heater/s as this will cause premature 
failure.  Electric  to  be  supplied  by  a  fused  supply  compliant  with  local  regulations,  and  fitted  by  a  qualified  Part  P 
Electrician. 
 

 

Содержание iSteel 120

Страница 1: ...iSteel INSTALLATION MANUAL ISSUE 2015 V1 FOR MORE INFORMATION GO TO www atagheating co uk...

Страница 2: ...eir G3 unvented qualification The installation of this product is also notifiable under the national Building Regulations ONCE COMPLETED THIS INSTRUCTION MANUAL IN ITS ENTIRETY SHOULD BE LEFT WITH THE...

Страница 3: ...ditional upstream pressure reducing device should be fitted A minimum of 22mm supply pipe work should ideally be provided and existing 1 2 15mm cold mains pipe work may need to be upgraded Hard water...

Страница 4: ...e Sealed or vented primary circuits can be used to comply with normal installation practice the primary pressure should not exceed 3 bar although the coil in the iSteel is suitable for up to 7 bar if...

Страница 5: ...nd maintenance of services supplying water for domestic use within buildings and their curtilages Have a vertical section of pipe at least 300mm long below the tundish before any elbows or bends in th...

Страница 6: ...the solar heat source Either primary coil connection may be used for flow or return The solar cylinder sensor supplied is inserted into the lower thermostat pocket and the energy cut out into the upp...

Страница 7: ...6 N 3 Port Mid Position E HTG ON DHW ON DHW OFF L N E SL 1 2 3 1 2 3 L N E N L N E 2 3 2 Port Heating Cutout combined Duostat 2 Port DHW PUMP Wiring Centre Room Stat Programmer Boiler G Grey Bl Blue...

Страница 8: ...your discharge pipework is free from debris and is carrying the water away without spillage over the tundish and release the valves and check that they re seat properly GENERAL Servicing should only...

Страница 9: ...ou have a problem in the first year contact the plumber who fitted the unit Thereafter contact the plumber who carries out the annual servicing for you If your iSteel develops a leak we will supply yo...

Страница 10: ...n of the boiler and its controls EXPANSION VESSEL Symptoms Possible causes Follow up action Discharge of water from the relief valve Expansion Vessel is too small Vessel needs resizing and installatio...

Страница 11: ...INLET CONTROL GROUP Fault Finding Information...

Страница 12: ...TUNDISH Fault Finding Information...

Страница 13: ...T P RELIEF VALVE Fault Finding Information...

Страница 14: ...DUAL THERMOSTAT Fault Finding Information...

Страница 15: ...IMMERSION HEATER Fault Finding Information...

Страница 16: ...ENERGY CUT OUT Fault Finding Information...

Страница 17: ......

Страница 18: ......

Страница 19: ...to third parties in the normal course of business In this respect the Buyer shall act in the capacity of the Companies commission agent and the proceeds of such sale 6 6 1 shall be held in trust for u...

Страница 20: ...ary Pressure Indirect Only 3 Bar Cylinder Data Table Capacity Weight Kg Empty iSteel 90 Direct 90 21 Indirect 88 27 iSteel 120 Direct 120 25 Indirect 118 31 iSteel 150 Direct 150 30 Indirect 148 35 Tw...

Отзывы: