Installation & Servicing instructions ATAG iC-Range
5
1 Introduction
These instructions describe the functioning, installation, use and primary maintenance of ATAG central heating
boilers for the United Kingdom
.
These instructions are intended for the use of Gas Safe registered installers in connection with the
installation and putting into operation of ATAG boilers. It is advisable to read these instructions thoroughly,
well in advance of installation. Separate instructions for use are supplied with the boiler for users of ATAG
central heating boilers. ATAG is not liable for the consequences of mistakes or shortcomings which have
found their way into the installation instructions or user’s manual. Further, ATAG reserves the right to alter its
products without prior notification.
When delivering the boiler, give the customer clear instructions concerning its use; present the
customer with the user’s manual and warranty card.
Each boiler is fitted with an identification plate. Consult the details on this plate to verify whether the boiler is
compliant with its intended location, e.g.: gas type, power source and exhaust classification.
On completion of the installation the installer or commissioning engineer must fill out and complete the
Benchmark Commissioning Checklist found on page 79 of this manual and hand this to the customer
for future record keeping. The Benchmark Service Record must also be completed by the service agent
following each service call, and return to the customer.