Chapter 2: Hardware Information
2-12
To install a 3.5” hot-swap storage device to the front panel:
1.
Push the spring lock to the right (A),
then pull the tray lever outward (B)
to release the tray. The tray ejects
slightly after you pull out the lever.
2.
Firmly hold the tray lever and pull the
tray out of the bay.
3.
Place the tray on a flat and stable surface.
4.
Prepare the 3.5” hot-swap storage device and the bundled set of screws.
Spring lock
Tray lever
Содержание RS720-E9-RS8
Страница 1: ...2U Rackmount Server User Guide RS720 E9 RS8 RS8 G ...
Страница 28: ...Chapter 1 Product Introduction 1 18 ...
Страница 84: ...Chapter 2 Hardware Information 2 56 ...
Страница 90: ...Chapter 3 Installation Options 3 6 3 3 Rail kit dimensions 589mm 43 6mm 900mm 43 6mm ...
Страница 92: ...Chapter 4 Motherboard Information 4 2 4 1 Motherboard layout ...
Страница 116: ...Chapter 4 Motherboard Information 4 26 ...
Страница 158: ...5 42 Chapter 5 BIOS Setup ...
Страница 193: ...Appendix Appendix This appendix includes additional information that you may refer to when configuring the motherboard ...
Страница 200: ...A 8 Appendix ...