GigaX Series L2 Managed Switch User Guide
67
5.1
Power On Self Test
POST is executing during the system booting time. It tests system memory,
LED and hardware chips on the switchboard. It displays system information as
the result of system test and initialization. You can ignore the information until
the prompt, “(
GigaX) %
”, appears (see Figure 42).
Figure 42. CLI interface
Содержание GigaX 2124X
Страница 1: ...GigaX Series Layer 2 Managed Switch User Guide ...
Страница 34: ...GigaX Series L2 Managed Switch User s Guide 34 Figure 15 Firmware Upgrade ...
Страница 36: ...GigaX Series L2 Managed Switch User s Guide 36 Figure 16 Physical Interface ...
Страница 45: ...GigaX Series L2 Managed Switch User Guide 45 Figure 23 Dynamic Address ...
Страница 48: ...GigaX Series L2 Managed Switch User s Guide 48 Figure 25 Tagged VLAN ...
Страница 57: ...GigaX Series L2 Managed Switch User Guide 57 Figure 33 USM User ...