
72
EN
Check list– Testing before initial operation
Fitting and installation
Check and document the correct fitting and installation of all components in the
escape route. For this purpose, use the test book provided by ASSA ABLOY
Sicherheitstechnik (D01350xx, page 38).
Function check
Checking and documenting locking
1 Close the door.
2 Activate the locking element.
Identifier
Yes
No
Do the red LEDs light up?
Is the door securely locked? (test manually)
3 Press the emergency button.
Identifier
Yes
No
Is the door released? (test manually)
Can the door be opened without using considerable effort?
Are the yellow and green LEDs on the terminal illuminated?
Does the integrated acoustic alarm sound?
Checking and documenting the alarm
1 Activate the locking system.
Identifier
Yes
No
Do the red LEDs light up?
Is the door securely locked? (test manually)
Check list– Testing before initial operation
Содержание EffEff 1340-14
Страница 31: ...31 DE Technische Daten ...
Страница 35: ...35 DE Checkliste Prüfung vor der Erstinbetriebnahme ...
Страница 67: ...67 EN Maintenance and inspection EN ...
Страница 71: ...71 EN Check list Testing before initial operation EN ...
Страница 74: ...74 EN ...
Страница 75: ...75 EN EN ...