Ascotel® IntelliGate® 2025/2045/2065 as of I7.9
Installation
103
sy
d-
020
4/1.
7
– I7.
9
– 1
2
.2009
Tab. 44
Cabling for primary rate access T2, networked with copper line
Fig. 53
Primary rate access, networked with transmission equipment TE
RJ45
Pin
T2 signal
PINX 1
Cable cores
Crossed patch cables
T2 signal
PINX 2
RJ45
Pin
1
RxA
RxA
1
2
RxB
RxB
2
3
—
—
3
4
TxA
TxA
4
5
TxB
TxB
5
6
—
—
6
7
—
—
7
8
—
—
8
haz1129aaxxa0
Transmission equipment
T2
T2
PINX 1
PINX 2
haz0627aaena0
max.
200 m
max.
200 m