- 40 -
AC
CABLE CONNECTION CROSS SECTION
Size
1.5 kW
2 kW
3 kW
Maximum output current (A)
7.5
10
15
Recommended minimum cross section (mm ²)*
1.5
1.5
2.5
Maximum cross section permitted by the
connection system
4.0
4.0
4.0
* In the presence of long connecting lines (> 5m), we recommend using the maximum permissible section. If even larger cross
sections are needed (e.g. connections with length > 20 m), it is advisable to place the circuit breaker upstream in proximity of the
inverter and use the cross sections in the table for the first connection stretch only.
E
LECTRICAL INSTALLATION
1.
It is advisable to install a circuit breaker (see “Recommended circuit breaker”).
2. Wire the movable DC connectors included in the accessories box, taking care to respect polarity: the male connector
with plastic is positive.
Caution:
when the photovoltaic generator is exposed to even minimal solar radiation, it produces a
dangerous DC voltage. It is advisable to isolate the generator before performing this operation.
3. Open the AC switch downstream from the inverter
4. Wire the AC connector, connecting the grounding connector to the terminal with the
symbol, the neutral to terminal
N, the phase to terminal L as per the following image:
1) Cable gland
2) Outlet body
3) Connector plug
5. Close the AC switch downstream from the inverter
Содержание SIRIO EASY 1500
Страница 1: ......
Страница 2: ......
Страница 6: ... 6 ...
Страница 30: ... 30 ...
Страница 34: ... 34 ...
Страница 58: ......
Страница 59: ......
Страница 60: ...0MNPES1K5AS2LUB ...