PECA 30 / 30E : wiring schema
48
ARDETEM
3-PHASE UNBALANCED WITHOUT NEUTRAL NETWORK WIRING
WITH MEASUREMENT OF THE 3 CURRENTS : NETWORK Nr 5
PECA
-
c
L1 L2 L3 L4 IR IS IT
+ - + - + -
1 2 3 4 5 6 7 8 9 10
Phase R
Phase S
load
Phase T
With external CT and VT :
phase R
phase S
phase T
S1
P1 P2
TP
S1
P1 P2
TC
S1
P1 P2
TP
S1
P1 P2
TC
S1
P1 P2
TC
1 3 4 5 6 7 8 9 10
Input :
Measured network
Note :
If the installation imposes in addition an external CT or VT :
Respect the wiring sense : to P1 corresponds S1 and to P2 corresponds S2.
Wire the secondary S2 of CT to the ground.
- voltage
calibre,
programmable 150V or 500V
-
internal CT : 1A or 5A
to choose at the order
Содержание PECA 30
Страница 2: ......