Service Support Spirit
12
Unique Solution
WWW.ARCBRO.COM
4. Installation
4.1 Introduction
Remove all the screws which are fixed the box, check and confirm all the spare parts be inside and
well, and then move all the parts out safely.
Install the machine carefully step by step as the following instructions
:
4.2 Longitudinal rails assembly (Y- axis)
Note:
the totally 3 types of Voyager transversal width are: 1.3m, 1.5m and 1.8m. The basic length of
Y-axis Rail is 2.5M. And it can be extended to the longest 15m by every extension in 1M.
1.
Take out two sections of the longitudinal rails structure.
2.
Take 16 pieces M5 bolts and square pad out, put 8 pieces nuts into the channel on each inner side
of the aluminium frame, with 4 pieces in each end of the two sections. Show as picture1.
Picture1. On each side, put 8 pads
3.
Align the two sections and make them connected well show as picture2
1
CNC control system
2
Cross beam
3
Frame rail
4
ARCBRO customized USB pen
5
ARCBRO Wizard auto nesting software
6
Voyager User Manual
7
Sliding blocks
8
Torch height controller (THC)
9
Ground wire
10
Torch holder: Mechanical control holder (Auto
control holder for plasma is optional)
11
Solenoid valves
12
Propane cutting nozzles
13
Seal capping
14
Stepping motors
15
Oxy fuel cutting torch (80mm neck) and hoses
16
Machine Power supply cable
17
Cushion blocks
18/19
Arc Start & Arc voltage wire