Wet Stove Installation Guide
8
Final check list and commissioning the stove
Before handing over the installation to the customer it is a requirement
under Document J (of the Building Regulations for England Wales) that
the appliance is lit and the functioning of the chimney system is checked
for satisfactory operation. The functioning of the hot water and heating
system should also be fully checked.
Please record the checks in the table below:
BK555 Rev09
19