AquaTelemetry Instruction Manual
10401-01193 Rev H
Once the sonde cable has been made off, ensure the cable gland is tightened to prevent
water ingress.
3.3.2. Antenna Installation
If the unit is configured for use with an external antenna, a suitable antenna should be
connected to the mating socket on the base of the unit and mounted in a position with good
access to the mobile phone network.
3.3.3. Applying Power (D Cell Version)
Replace the D size primary batteries. Do not fit the main box cover until after the installation
has been tested as detailed in section
3.3.4. Solar Panel Installation
If you are installing a solar panel with this system, a Universal Side-of-Pole mount will have
been supplied with the panel.
The solar panel should be pole mounted using the adjustable brackets provided and
orientated due south (in the northern hemisphere) at a suitable angle to the sun. This angle
will obviously vary with the time of year and periodic adjustments may optimise the panel's
output, especially during the winter months. When mounting the solar panel, follow the
instruction sheet enclosed with the mounting kit.
When the solar panel has been installed, connect the cable to the mating socket on the
base of the Aqua Telemetry unit.
3.3.5. Activating the Solar Charge Controller
After attaching the solar panel plug to the socket, slide the power switch to the ON position.
If there is any sunlight striking the solar panel at all, the PV LED on the controller should
illuminate solidly indicating that the solar panel is delivering voltage to the system.
The LOAD LED should be off. If the LOAD LED is illuminated, briefly push the on/off button
on the controller to switch it off.
© 2020 Aquaread
®
Ltd.
www.aquaread.com
Page 18 of 34