Aquarian Thermo
installation instuctions
page 11
Lubricate the supply pipe ends using a suitable
silicone based lubricant and run a thin bead of
silicone sealant in the mastic groove of the back
plate. Slide the assembly down the projecting
pipes flush to the wall surface ensuring the hot
and cold markings are uppermost.
Secure to the wall using the screws provided.
11
The installation may now be checked for leaks. Turn the on/off knob
(left hand knob) fully forwards to ensure the valve is fully turned off.
If possible, ensure the shower can discharge safely to waste.
12
Turn on the supplies and check for any leaks
upstream of the valve. Slowly open the on/off
control and check for leaks downstream of the
valve. If all is sound, turn off the on/off knob
fully and turn off the supplies.
13
Refit the lower shroud by locating the lugs into the back plate and moving
the shroud into position. Align the fixing screws with the screw holes, and fix
into place ensuring not to overtighten the fixing screws.
14
Refit the cartridge to the back plate.
10
Locate the bottom outlet blanking cap
(supplied in the screwpack) into the lower
shroud and click into position.
15