VI. STEP-BY-STEP ASSEMBLY INSTRUCTIONS
The technical procedures in this section are to be performed only by personnel who have
received factory authorized training through an Aqua Lung Service and Repair Seminar.
NOTES ON DISASSEMBLY AND ASSEMBLY
1.
Disassembly procedures are the reverse of assembly.
2.
All components must be clean and fully serviceable prior to assembly.
3.
All o-rings must be lubricated prior to assembly.
3/8" Nut Driver
5/16" Flat Blade Screwdriver (Regulator Adjust)
7/16" Nut Driver
Phillips #3 Screwdriver
3/16" Allen/Hex Key
15/16" Deep Socket and Driver
1/4" Allen/Hex Key
11/16" Socket and Driver
5/8" Flat OE Low Profile / Slim Wrench
7/8" Deep Socket and Driver
11/16" Flat OE Low Profile / Slim Wrench
Torque Screwdriver (20 - 140 inch pounds)
O-Ring Tool (Brass or plastic)
Torque Wrench (10 - 40 foot pounds)
3/8" Flat Blade Screwdriver
TOOLS REQUIRED FOR ANNUAL MAINTENANCE
• Second Stage Regulator
• Free Flow / Water Dump Valve
• Manifold
• Defogger
• Oral-Nasal Mask
• Nose Clearing Device (NCD)
• Face Port Assembly
HELMET SUB-ASSEMBLIES IN THIS SECTION
• Communications
• Head Liner
• Neck Retainer and Locking System
• Helmet Final Assembly
• Neck Dam Assembly
• Quad Ring Installation
NOTE:
Additional tools are required for maintenance of the Apeks GX300 Second Stage Regulator.
Details are contained in contained in the separate Apeks document
GX300 REGULATOR FOR
THE AQUA LUNG G3000SS DIVING HELMET - MAINTENANCE MANUAL.
25