SECTION 5: TECHNICAL SPECIFCIATIONS
Entire Contents Copyright
2014 by Adaptive Power Systems, Inc. (APS) • All Rights Reserved • No reproduction without written authorization from APS.
42L Series Modular DC Load Operation Manual
Page 32 of 88
5.3
Cleaning
To clean this product uses a soft or slightly damp cloth.
CAUTION
BEFORE you clean the unit, switch the mains power off and disconnect the
input line cord.
・
Please do NOT use any organic solvent capable of changing the nature of
the plastic such as benzene or acetone.
・
Please ensure that no liquid is allowed to penetrate this product.
5.4
Powering Up
The following procedure should be followed before applying mains power:
1.
Check that the POWER switch is in the OFF (O) position.
2.
Verify that the rear panel voltage selector of the chassis is correctly set.
3.
Check that nothing is connected to any of the DC INPUT (load input terminals) on
the front and/or rear panels.
4.
Connect the correct AC mains line cord to the 42L Series load AC input terminal.
5.
Plug the line cord plug into a suitable AC outlet socket.
6.
Turn on (I) the POWER switch.
7.
If the instrument does not turn on for some reason, turn OFF the POWER switch and
verify the presence of the correct AC line input voltage using appropriate safety
measures.
5.5
In Case of Malfunction
In the unlikely event of an instrument malfunction or if the instrument does not turn on
despite the presence of the correct AC line voltage, please attach a warning tag to the
instrument to identify the owner and indicate that service or repair is required. Contact
Adaptive Power Systems or its authorized representative to arrange for service.