![APQS Freddie Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/apqs/freddie/freddie_installation-manual_2955518053.webp)
Millie – Millie 30 – Freddie Installation
9-1-2022
APQS.com
53
Cord Management (Bliss or Non-Bliss)
1.
Plug the power cord into
the machine.
2.
Feed the power cord into the plastic cord supports.
3.
Use the two hook and loop
fastener strips attached to
the right handle to support
the power cord and CAT-5
Carriage Encoder Cable.
4.
Slip the cushion clamp
over the power cord.
Insert the mounting
screw into the mounting
hole. Just get it started
for now.
5.
Push the machine all the
way forward to check the
cord travel. Adjust the
cushion clamp on the
carriage to allow free
movement without binding
the cords or having them
rub on the table. Tighten
the cushion clamp. Use zip
ties to hold the carriage
encoder cable and main
power cable together. Trim
zip tie ends.