![APQS Freddie Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/apqs/freddie/freddie_installation-manual_2955518037.webp)
Millie – Millie 30 – Freddie Installation
9-1-2022
APQS.com
37
Step 7: Install the Rollers
Tools Required: Phillips Screwdriver
Utility Knife
Unpacking Box 2 – Roller Tubes
1.
Open Box 2 as you did the Rail Box (Box 1), removing two screws from each end and cutting the
strapping tape. Locate the roller labled “Pick Up.” (Each of the fabric rollers have stamped labels of
“Pick Up,” “Backing” and “Quilt Top.” The Leveler Bar has no canvas attached and is not labeled.)
Each roller has a shaft end and a threaded end.
2.
Move the machine head toward the left table leg. Place the shoulder bolts and spacers near this
side of the table.
The shaft ends fit into ball (heim) joints on the
RIGHT table leg (when viewed from the needle
side of the machine).
The threaded ends face the LEFT table leg.
The shoulder bolts and collar spacers will
mount the threaded end of the left table leg.