Millie – Millie 30 – Freddie Installation
9-1-2022
APQS.com
10
Deluxe Table
Step 1: Assemble the Rails & Legs
Tools
Utility Knife
Required: Wire Cutter or Scissors
Phillips Screwdriver
½’’ Box & Open-End Wrench
½’’ Socket Wrench
¾’’ Box & Open-End Wrench
or Crescent Wrench
Rail Box (Box 1)
THE RAIL BOX DOES NOT NEED TO BE MOVED TO YOUR SEWING AREA IMMEDIATELY; it is a heavy box and
can be opened before moving.
1.
Remove two Phillips-head screws from each side of the top cover of box.
2.
Using utility knife, cut packing tape on box.
3.
Once open, cut zip ties from rails using wire cutters or scissors.
4.
Locate all hardware. (Attached to rails under a zip tie, packed in plastic. Do not throw this away.)
5.
MOVE rails to sewing area individually; be aware of sewing table orientation before moving the
rollers and rails. Each roller is stamped for the use of each: “Backing,” “Pick-Up,” “Quilt Top.” The
stamped portion of the roller will be installed to the right or needle side of the frame. The rails will
be installed with the flat side of each rail facing each other.