12
OPERATING GUIDELINES
6. Reworking task can be started 1 minute after the desired hot air
temperature and airflow level are reached, as also indicated from
display panel “18” .
6. When reworking is complete, return the Hot Air Gun to its holder
but DO NOT immediately turn off the main power switch.
7. Deactivate the Hot Air Gun Activation button first in order to activate
the auto-cooling process. The system will start to blow air (at room
temperature) at a fast rate to reduce heat from the hot air gun and
bring down the temperature to a reasonable safe level of 90°C.
During this time, the air flow display will also change “cool” while
temperature is gradually decreasing. Once the temperature drops to
approximately 90°C the system will halt and display “OFF” on the
panel. It is now safe to switch off the main power switch.
9. Turn OFF the main power switch.
10. Unplug the device from the main power source.
C. AUTOMATE FUNCTION
The system is equipped with a 5 stage automated hot air rework
profiling system. To access and change the time and temperature
settings of the profile follow the guide below:
IMPORTANT:
When adjusting the air temperature, it is strongly
advised to initially increase the airflow level in order to
man-
age
the
system temperature. This is to protect the heating
element inside the handle from excessive heat and avoid the
possibility of subjecting adjacent components to thermal
shock.
Содержание INT 2703A+
Страница 30: ...REPLACEMENT SOLDERING TIPS ...