000-015-480 Issue 5
22
nd
May 2017
Anite S-CORE Getting Started Guide
Page 24 of 47
Commercial In Confidence
To start running test cases, perform the following steps:
1.
Ensure you have selected and activated the correct PICS/EICS as follows:
a.
Select
PICS Pool
from the menu, which displays the PICS Pool window.
b.
On the PICS Pool window, select the PICS file to use and click
Set Active PICS
.
c.
Click
Close
to close the dialog.
2.
Select the required test cases to run, then click on the
Start
button to begin running test cases.
The activity window on the right side of the S-CORE GUI will give you real-time reports and
instructions as the test case progresses.
Press the power button [8] at the front panel of the S-CORE to shut down the whole system.