Commissioning and powering up
Connecting and powering up / powering down
InnuPure C12
Issue 01/2011
15
5
Commissioning and powering up
5.1 Connecting and powering up / powering down
Electric shock!
Before connecting the InnuPure C12 to the mains supply, check that the
operating voltage on the power sign on the device agrees with the mains
voltage at the intended socket. Operation with any other operating voltage than
that specified can lead to the destruction of the device.
Caution condensed water!
In case of large differences between the storage and installation temperatures,
wait until the InnuPure has attained the ambient temperature before connecting
to avoid damage to the device caused by condensed water.
1. Remove the InnuPure C12 from its packaging
2. Connect the mains cable to the connector on the back side of the device
3. Switch on InnuPure C12 at the main switch (backside of the device). The
InnuPure C12 now will be initialized automatically.
4. After the first screen appears wait until a beep is audible.
5. Press
[ENTER/Start]
after the start-up screen appears to enter the main
menu of the InnuPure C12. The InnuPure C12 is now ready for operation.
Fig. 5-1
Main menu
Powering down
At the end of the isolation protocol you can power down the InnuPure C12 at
the mains switch.
Содержание aj CYBERTRON InnuPure C12
Страница 1: ...InnuPure C12 Extraction system...
Страница 38: ...Up date of the InnuPure C12 Delete isolation protocols 36 Issue 01 2011 InnuPure C12...
Страница 42: ...Waste disposal 40 Issue 01 2011 InnuPure C12...
Страница 44: ...Technical data 42 Issue 01 2011 InnuPure C12...
Страница 46: ...Table of figures 44 Issue 01 2011 InnuPure C12...
Страница 47: ......