Installation Procedures: 12" and 15" Panels
61
VG-Series Modero Touch Panels
3.
Remove the magnetic faceplate/bezel (
A
in
FIG. 42) from the main NXD unit (
B
in
FIG. 42) by
gripping the faceplate and pulling with gentle outward force.
4.
Thread the incoming RJ-45, Ethernet, USB, and any other audio/video wiring (from their terminal
locations) through the cutout opening. Refer to the
Wiring Guidelines for the 1200VG and 1500VG
Panels
section on page 68 for pinout descriptions.
Leave enough slack in the wiring to
accommodate any re-positioning of the panel
.
5.
Connect all data and power wiring connectors to their corresponding locations along the side of the
(un-powered) NXD touch panel.
Verify the terminal end of the power cable is not connected to a power supply before plugging
in the 2-pin power connector.
The USB connectors can be from a either a USB extension cable, or a wireless USB RF
transmitter.
6.
Test the incoming wiring by attaching the panel connections to their terminal locations and applying
power. Verify the panel is receiving power and functioning properly to prevent repetition of the
installation.
7.
Disconnect the terminal end of the power cable from the connected power supply.
FIG. 40
NXD-1200VG 12-inch Wall Mount panel dimensions using expansion clips
FRONT BEZEL
CUTOUT
Содержание Modero NXT-1500VG
Страница 4: ......
Страница 62: ...Touch Panel Accessories 52 VG Series Modero Touch Panels...
Страница 100: ...Installation Procedures 17 Panels 90 VG Series Modero Touch Panels...
Страница 178: ...Firmware Pages and Descriptions 168 VG Series Modero Touch Panels...
Страница 250: ...Appendix 240 VG Series Modero Touch Panels...
Страница 251: ...Appendix 241 7 Modero Widescreen Touch Panels...