3
II. INSTALLATION REQUIREMENT
A.
TOOLS REQUIRED
Rotary Hammer Drill (
Φ
19)
Hammer
Level Bar
English Spanner (12")
Ratchet Spanner With Socket (28
#
)
Wrench set
Carpenter’s Chalk
Screw Sets
Tape Measure (295-1/4”)
Pliers
Socket Head Wrench (3
#
, 5
#
, 8
#
)
Lock Wrench
(10
#
, 13
#
, 14
#
, 15
#
, 17
#
, 19
#
, 24
#
,27
#
, 30
#
,)
Fig. 3
Содержание HS-12
Страница 1: ...TWO POST LIFT Model HS 12 ...
Страница 2: ......
Страница 4: ...0 ...
Страница 6: ...2 Arm Swings View For Model HS 12 Fig 2 ...
Страница 12: ...8 D Install parts of extension columns See Fig 15 Fig 15 ...
Страница 20: ...16 J Install safety device See Fig 23 Fig 24 Fig 23 Powerside safety device Fig 24 Offside safety device ...
Страница 21: ...17 K Lift the carriages up by hand and make them be locked at the same level See Fig 25 Fig 25 ...
Страница 28: ...24 IV EXPLODED VIEW Model HS 12 Fig 37 Car in direction ...
Страница 29: ...25 Main Cylinder Secondary Cylinder Fig 38 Fig 39 ...
Страница 39: ...35 ...
Страница 40: ...36 AMGO HYDRAULIC CORPORATION Tel 803 505 6410 Fax 803 505 6410 1931 Jo Rogers Blvd Manning South Carolina USA ...