B. SPECIFICATIONS OF CONCRETE
(See Fig. 4)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 4” minimum and without reinforcing steel bars, and
must be totally dry before lift installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
minimum.
3. Floors must be level with no cracks or holes.
C. POWER SUPPLY
The electrical source must be
2.0HP
minimum. The source cable size must be
2.5mm
2
and in good condition of contacting with floor.
III
.
INSTALLATION STEPS
A. Location of installation
Check and ensure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B.
Use a carpenter’s chalk line to establish installation layout of base plate
(See Fig. 5)
.
Concrete intensity must be
3,000psi minimum
Fig. 4
Model HS-12
Chalk Line
(150-3/4”)
Fig. 5
36
4”
Содержание HS-12
Страница 1: ...TWO POST LIFT Model HS 12 ...
Страница 2: ......
Страница 4: ...0 ...
Страница 6: ...2 Arm Swings View For Model HS 12 Fig 2 ...
Страница 12: ...8 D Install parts of extension columns See Fig 15 Fig 15 ...
Страница 20: ...16 J Install safety device See Fig 23 Fig 24 Fig 23 Powerside safety device Fig 24 Offside safety device ...
Страница 21: ...17 K Lift the carriages up by hand and make them be locked at the same level See Fig 25 Fig 25 ...
Страница 28: ...24 IV EXPLODED VIEW Model HS 12 Fig 37 Car in direction ...
Страница 29: ...25 Main Cylinder Secondary Cylinder Fig 38 Fig 39 ...
Страница 39: ...35 ...
Страница 40: ...36 AMGO HYDRAULIC CORPORATION Tel 803 505 6410 Fax 803 505 6410 1931 Jo Rogers Blvd Manning South Carolina USA ...