8
E. Position columns
(See Fig. 13)
Check the columns plumbness with level bar, and adjusting with the shims if the
columns are not vertical.
F. Fix anchor bolts
1. Prepare anchor bolts
(See Fig. 14)
.
Fig. 14
2. Using the prescribed rotary hammer drill, and drill all the anchor holes and install the
anchor bolts. Then tighten the anchor bolts
(See Fig. 15).
Note:
Torque of Anchors is 150N.m .Minimum embedment of Anchors is 4
-3/8”
.
Fig. 15
Lock washer
Washer
Nut
4
-3
/
8
”
Check the columns plumbness
with level bar from front and
side
Fig.13
BP-9X:136-1/4
”
BP-10:139-1/8
”
112-1/4
”
Содержание BP-10
Страница 1: ...TWO POST LIFT Model BP 9X BP 10 ...
Страница 4: ...2 Arm Swings View 2560mm 100 3 4 Fig 2 ...
Страница 11: ...9 G Raise up the carriage and lock it in the same position of safety device see Fig 16 Fig 16 ...
Страница 14: ...12 I Assemble oil hose assy See Fig 19 Fig 19 71 73 72 71 69 70 71 71 68 ...
Страница 19: ...17 IV EXPLODED VIEW Model BP 9X BP 10 Fig 28 ...
Страница 25: ...23 4 3 MANUAL POWER UNIT 071101 Fig 32 Manual Power unit 220V 60Hz ...