4
B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal temperature, ventilated
and dry place.
C.The equipment should be unload and transfer by forklift.
D. SPECIFICATIONS OF CONCRETE
(See Fig. 5).
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 6” minimum and without reinforcing steel bars, and
must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
(210kg/cm²) minimum.
3. Floors must be level and no cracks.
Concrete intensity must be
3000psi (210kg/cm²) minimum
Fig. 4
65
6
”
Fig. 5
Содержание BP-10
Страница 1: ...TWO POST LIFT Model BP 9X BP 10 ...
Страница 4: ...2 Arm Swings View 2560mm 100 3 4 Fig 2 ...
Страница 11: ...9 G Raise up the carriage and lock it in the same position of safety device see Fig 16 Fig 16 ...
Страница 14: ...12 I Assemble oil hose assy See Fig 19 Fig 19 71 73 72 71 69 70 71 71 68 ...
Страница 19: ...17 IV EXPLODED VIEW Model BP 9X BP 10 Fig 28 ...
Страница 25: ...23 4 3 MANUAL POWER UNIT 071101 Fig 32 Manual Power unit 220V 60Hz ...