5
E. POWER SUPPLY
The electrical source must be 2.0HP minimum. The source cable size must be
2.5mm² and in good condition of contacting with floor.
III
.
STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B.
Use a carpenter’s chalk line to establish installation layout of baseplate
(See Fig.
6
)
.
C. Check the parts before assembly.
1. Packaged lift and hydraulic power unit
(
See Fig. 7).
Fig. 7
Fig. 6
Chalk line
BP-9X:136-1/4
”
BP-10:139-1/8’’
Содержание BP-10
Страница 1: ...TWO POST LIFT Model BP 9X BP 10 ...
Страница 4: ...2 Arm Swings View 2560mm 100 3 4 Fig 2 ...
Страница 11: ...9 G Raise up the carriage and lock it in the same position of safety device see Fig 16 Fig 16 ...
Страница 14: ...12 I Assemble oil hose assy See Fig 19 Fig 19 71 73 72 71 69 70 71 71 68 ...
Страница 19: ...17 IV EXPLODED VIEW Model BP 9X BP 10 Fig 28 ...
Страница 25: ...23 4 3 MANUAL POWER UNIT 071101 Fig 32 Manual Power unit 220V 60Hz ...