7
5. Open the carton of parts and check the parts according to parts box list
(See Fig. 11).
D. Position power-side columns
Lay down two columns on the installation site parallelly, position the power-side
column according to the actual installation site. Usually, it is suggested to install
power-side column on the front-right side from which vehicles are driven to the lift
(See Fig. 12).
Fig. 12
Car in Direction
Power-side column
Offside column
Assemble top-plate
using M10*35 hex
bolt with nut and lock
washer
Fig. 11
Содержание BP-10
Страница 1: ...TWO POST LIFT Model BP 9X BP 10 ...
Страница 4: ...2 Arm Swings View 2560mm 100 3 4 Fig 2 ...
Страница 11: ...9 G Raise up the carriage and lock it in the same position of safety device see Fig 16 Fig 16 ...
Страница 14: ...12 I Assemble oil hose assy See Fig 19 Fig 19 71 73 72 71 69 70 71 71 68 ...
Страница 19: ...17 IV EXPLODED VIEW Model BP 9X BP 10 Fig 28 ...
Страница 25: ...23 4 3 MANUAL POWER UNIT 071101 Fig 32 Manual Power unit 220V 60Hz ...