4
2. Open the outer packing carefully
(See Fig. 5)
.
Shipment Parts List
3. Take off the drive-thru ramps and columns
(See Fig. 6)
.
4. Loose the screws of the upper package stand, take off the offside platform, take out
the parts inside the powerside platform, than remove the package stand.
5. Move aside the parts and check the parts according to the shipment parts list
(See Fig. 7).
Powerside Platform
Drive-in Ramp
Offside Platform
Cross Beam
Column
Fig. 5
Fig. 6
Parts box
Fig. 7
43
Содержание PRO-14
Страница 1: ...FOUR POST LIFT PRO 14...
Страница 2: ......
Страница 4: ......
Страница 11: ...7 D Install cross beams See Fig 11 Fig 12 Fig 11 Hole towards inside 1 3 2 3 Fig 12...
Страница 25: ...21 O Install spring and safety cover of cross beam See Fig 34 Fig 34 3 3 3 8 40 3 2 Fig 33...
Страница 27: ...23 IV EXPLODED VIEW Model PRO 14 Fig 36...
Страница 28: ...24 3 73 74 CROSS BEAM CYLINDERS Fig 37 Fig 38...
Страница 29: ...25 MANUAL POWER UNIT Fig 39 220V 50HZ 1 phase 380V 50HZ 3 phase...
Страница 39: ......
Страница 40: ...AMGO HYDRAULIC CORPORATION Tel 803 505 6410 Fax 803 505 6410 1931 Jo Rogers Blvd Manning South Carolina USA...