16
L. Install hydraulic system
(See Fig. 25).
Note: Oil hoses connected to oil cylinder must be passed above the cable, cylinder
inlet port must swing upward to avoid the oil hose and oil return pipe scratched
by cable.
M. Install air-line system
1. Cut the
¢
6
×¢
4 black air lines of cross beams between the two retainers, and then
connect with T-Fitting
(See Fig. 26)
.
d
c
b
a
Retainer
Protective Ring
Fig. 25
cylinder inlet
port swing
upward
Содержание PRO-14
Страница 1: ...FOUR POST LIFT PRO 14...
Страница 2: ......
Страница 4: ......
Страница 11: ...7 D Install cross beams See Fig 11 Fig 12 Fig 11 Hole towards inside 1 3 2 3 Fig 12...
Страница 25: ...21 O Install spring and safety cover of cross beam See Fig 34 Fig 34 3 3 3 8 40 3 2 Fig 33...
Страница 27: ...23 IV EXPLODED VIEW Model PRO 14 Fig 36...
Страница 28: ...24 3 73 74 CROSS BEAM CYLINDERS Fig 37 Fig 38...
Страница 29: ...25 MANUAL POWER UNIT Fig 39 220V 50HZ 1 phase 380V 50HZ 3 phase...
Страница 39: ......
Страница 40: ...AMGO HYDRAULIC CORPORATION Tel 803 505 6410 Fax 803 505 6410 1931 Jo Rogers Blvd Manning South Carolina USA...