10
H. Install power side platform.
1. Put the power side platform upon the cross beams by fork lift or manual, offset the
cross beams to the outside till the pulleys of both platforms can set up into the cross
beams
(See Fig.18)
, Install the power side platform and screw up the bolts
(See
Fig.19)
.
Fig. 18
Pulley installation
Fig. 19
Offset the cross beam lean
outward when putting the
power side platform on the
cross beams
8
Offset the cross beam
lean outward when
putting the powerside
platform on the cross
beams
Tighten the power side platform
and cross beam with bolts
M16*40
Содержание PRO-14
Страница 1: ...FOUR POST LIFT PRO 14...
Страница 2: ......
Страница 4: ......
Страница 11: ...7 D Install cross beams See Fig 11 Fig 12 Fig 11 Hole towards inside 1 3 2 3 Fig 12...
Страница 25: ...21 O Install spring and safety cover of cross beam See Fig 34 Fig 34 3 3 3 8 40 3 2 Fig 33...
Страница 27: ...23 IV EXPLODED VIEW Model PRO 14 Fig 36...
Страница 28: ...24 3 73 74 CROSS BEAM CYLINDERS Fig 37 Fig 38...
Страница 29: ...25 MANUAL POWER UNIT Fig 39 220V 50HZ 1 phase 380V 50HZ 3 phase...
Страница 39: ......
Страница 40: ...AMGO HYDRAULIC CORPORATION Tel 803 505 6410 Fax 803 505 6410 1931 Jo Rogers Blvd Manning South Carolina USA...