8
E. Fix the anchor bolts
1. Prepare the anchor bolts
(See Fig. 13).
2. Using the prescribed rotary hammer drill, and drill all the anchor holes and install
the anchor bolts, do not tighten the anchor bolts first
(See Fig. 14).
Note: Anchor bolts driven into the ground at least 90mm
F. Install the safety ladders
1. Take off the pulley safety cover and unscrew the four upper nuts of the Safety
Ladders, and then adjust the four lower nuts to be at the same position. Withdraw
the Slack-cable safety lock of the Cross-beam to insert the Safety Ladder in, raise the
Safety Ladder, and screw the upper nuts
(See Fig. 15).
Nut
Lock washer
Washer
Fig. 13
Fig. 14
Drilling
Expand
Clearing
5
Fig. 15
Safety Ladder is inserted between
Limit Pins of the cross-beam
6
Limit Pin
Limit Pin
Safety Ladder
Safety Ladder is
inserted between
Limit Pins
Slack-cable safety lock
Primary safety lock
9
0
m
m
Содержание PRO-14
Страница 1: ...FOUR POST LIFT PRO 14...
Страница 2: ......
Страница 4: ......
Страница 11: ...7 D Install cross beams See Fig 11 Fig 12 Fig 11 Hole towards inside 1 3 2 3 Fig 12...
Страница 25: ...21 O Install spring and safety cover of cross beam See Fig 34 Fig 34 3 3 3 8 40 3 2 Fig 33...
Страница 27: ...23 IV EXPLODED VIEW Model PRO 14 Fig 36...
Страница 28: ...24 3 73 74 CROSS BEAM CYLINDERS Fig 37 Fig 38...
Страница 29: ...25 MANUAL POWER UNIT Fig 39 220V 50HZ 1 phase 380V 50HZ 3 phase...
Страница 39: ......
Страница 40: ...AMGO HYDRAULIC CORPORATION Tel 803 505 6410 Fax 803 505 6410 1931 Jo Rogers Blvd Manning South Carolina USA...