Operation
Sorensen SGI Series
3-8
M550221-01 Rev U
Item
Reference
Functional Description
1
AC Input Connectors
Connection for 3-phase AC.
2
AC Input Safety Ground
Connection for safety ground wire.
3
DC Output Bus Bars
Positive (+) and negative (
–) outputs.
3a HV DC Output Studs
Positive (+) and negative (
–) outputs for 800V and
1000V models only.
4
PAR OUT
Parallel Out connector of master unit for configuring
parallel operation of units when connected to Parallel In
connector of slave unit; see Section 3.16.
5
PAR IN
Parallel In connector of slave unit for configuring parallel
operation of units when connected to Parallel Out
connector of master unit; see Section 3.16.
6
ANALOG CONTROL
Remote Analog Interface connector, J1, for
programming and monitoring signals of output, status
indication, and remote shutdown signals; see Table 3
–5
for individual pin descriptions.
7
SENSE Connector
Input connector, J3, for remote sensing of voltage at the
load to compensate for line drop in load cables; see
Section 3.14.
7a HV SENSE Connector
Input connector,J3, for remote sensing of voltage at the
load to compensate for line drop in load cables, 800V
and 1000V models only; see Section 3.14.
8
RS-232 Connector
†
RS-232 connector for remote digital control.
9
Configuration Switch
†
Four
–position DIP switch to configure the digital
interface of the unit
10
External User
Connector
†
Input/Output connector for external auxiliary digital
control signals.
11 ETHERNET Connector
†
Ethernet connector for remote digital control.
12 RESET Switch
†
Reset switch to return configuration parameters to
factory default settings; must be depressed until LAN
LED is blinking.
13 LAN
†
LED indicator: continuously on indicates Ethernet
connection; off indicates no Ethernet connection;
blinking indicates Instrument ID.
Refer to Figure 3-4, Figure 3-7, and Figure 3-10.
†
Refer to the Programming Manual for details on the digital interface.
Table 3
–4. Rear Panel Connectors and Controls, Ethernet Option
Содержание Sorensen SGI Series
Страница 1: ...M550221 01 Rev U www programmablepower com SGI Series DC Power Supplies Operation Manual...
Страница 2: ......
Страница 34: ...Installation Sorensen SGI Series 2 12 M550221 01 Rev U Figure 2 2 Installation Drawing 3U Models 10V 30V...
Страница 35: ...Sorensen SGI Series Installation M550221 01 Rev U 2 13 Figure 2 3 Installation Drawing 3U Models 40V 600V...
Страница 36: ...Installation Sorensen SGI Series 2 14 M550221 01 Rev U Figure 2 4 Installation Drawing 3U Models 800V and 1000V...
Страница 37: ...Sorensen SGI Series Installation M550221 01 Rev U 2 15 Figure 2 5 Installation Drawing 6U Models 20kW 30kW...
Страница 38: ...Installation Sorensen SGI Series 2 16 M550221 01 Rev U Figure 2 6 Rear Panel Standard 3U Models 10V 30V...
Страница 39: ...Sorensen SGI Series Installation M550221 01 Rev U 2 17 Figure 2 7 Rear Panel GPIB Option 3U Models 10V 30V...
Страница 40: ...Installation Sorensen SGI Series 2 18 M550221 01 Rev U Figure 2 8 Rear Panel Ethernet Option 3U Models 10V 30V...
Страница 41: ...Sorensen SGI Series Installation M550221 01 Rev U 2 19 Figure 2 9 Rear Panel Standard 3U Models 40V 600V...
Страница 42: ...Installation Sorensen SGI Series 2 20 M550221 01 Rev U Figure 2 10 Rear Panel GPIB Option 3U Models 40V 600V...
Страница 44: ...Installation Sorensen SGI Series 2 22 M550221 01 Rev U Figure 2 12 Rear Panel Standard 6U Models 20kW 30 kW...
Страница 45: ...Sorensen SGI Series Installation M550221 01 Rev U 2 23 Figure 2 13 Rear Panel GPIB Option 6U Models 20kW 30 kW...
Страница 48: ...Installation Sorensen SGI Series 2 26 M550221 01 Rev U This page intentionally left blank...
Страница 103: ...Sorensen SGI Series Operation M550221 01 Rev U 3 55 Figure 3 26 Parallel Connection and Remote Sense...
Страница 116: ...Maintenance Sorensen SGI Series 5 4 M550221 01 Rev U This page intentionally left blank...
Страница 120: ...Index Sorensen SGI Series Index 4 M550221 01 Rev U This page intentionally left blank...