Testing Film Samples
AQUATRAN 3/38 Operator’s Manual
6-12
Revision G
MOCON, Inc.
A permeation test can be setup using a “Saved Test Method” by selecting the “Methods” control displayed
at the bottom of the Advanced Test Method screens.
For more information on setting up and starting a test see the Instrument Help system.
Monitoring and Controlling a Film Test
The status of an active test can be monitored and controlled using the “Home”, “Cell Status” and
“Instrument Status” screens. These screens are accessed by selecting the “Home” and “Status” icons.
As each phase or state in a test is completed the test will automatically be advanced to the next step as
specified by the currently executing test method. The operator can control (override) the execution of the
test using the Abort, Advance and GoTo controls.
Test data can be viewed, and reports created (in graphical or tabular form) using the controls on the Cell
and Instrument status screens.
For more information on setting up, starting tests and generating reports see the Instrument Help system.