Controller / User Interface | 4-27
Display
During normal operation, these message lines display the real-time
status of the species being measured (top line) and its concentration
value (bottom line).
When an Auto-Setup is in progress, messages indicating the current
stage of the Auto-Setup are displayed on the top line. Auto-Setup mes-
sages include:
• Adjusting PMT Level
• Adjusting Lamp Pulses
• Adjusting PMT Balance
• Adjusting PMT Level
• Adjusting Lamp Pulses
• Setting Up ALC
• Off/Completed
This information is also displayed on other screens.
Green text = normal conditions.
Red text = Warning or Fault alarm active.
For details about alarms and corrective action required to reset alarms,
see “Diagnostics and Troubleshooting” in Chapter 6.
Auto-Setup
button
Initiates the Automatic-Setup, which optimizes the PMT gains and
source lamp currents. This function combines automatic signal adjust-
ment with manual jumper positioning. The Auto-Setup process takes
approximately three minutes. Always perform an Auto-Setup after
any lamps, optical filters, or PMTs have been replaced.
When this button is clicked, a pop-up message is displayed asking
“Would you like to proceed with the Bench Auto Setup?”. This mes-
sage also lists conditions that need to be met before proceeding. If the
conditions have been met and you wish to proceed with the Auto-
Setup, click
Yes
. If not, click
No
.
After a successful Auto-Setup, the
PMT Level
should be 7200–7400
mV, while the
PMT Balance
should be 2000–9000 mV. If these val-
ues are outside these ranges, see “PMT Level and PMT Balance” in
Chapter 6.
Cancel Auto-Setup
button
Stops the Automatic-Setup.
Содержание 931S
Страница 24: ...1 8 Model 931S Model 932S UV Analyzers This page intentionally left blank...
Страница 34: ...2 10 Model 931S Model 932S UV Analyzers...
Страница 35: ...Specifications 2 11...
Страница 36: ...2 12 Model 931S Model 932S UV Analyzers...
Страница 37: ...Specifications 2 13...
Страница 38: ...2 14 Model 931S Model 932S UV Analyzers...
Страница 39: ...Specifications 2 15...
Страница 46: ...2 22 Model 931S Model 932S UV Analyzers...
Страница 71: ...Installation and Start Up 3 25 Figure 3 8 Conduit entries and AC power connection locations Lower Enclosure...
Страница 96: ...3 50 Model 931S Model 932S UV Analyzers This page intentionally left blank...
Страница 170: ...4 74 Model 931S Model 932S UV Analyzers This page intentionally left blank...
Страница 184: ...5 14 Model 931S Model 932S UV Analyzers This page intentionally left blank...
Страница 221: ...Maintenance and Troubleshooting 6 37 Figure 6 12 Optical Bench Chopper Assembly Maintenance diagram 100 2313 1A...
Страница 237: ...Maintenance and Troubleshooting 6 53 Figure 6 14 AC Distribution board P N 100 1771...
Страница 238: ...6 54 Model 931S Model 932S UV Analyzers Figure 6 15 Host Controller board P N 100 1757 SW100...
Страница 239: ...Maintenance and Troubleshooting 6 55 Figure 6 16 Microcontroller board P N 100 1781 SW400...
Страница 250: ...6 66 Model 931S Model 932S UV Analyzers This page intentionally left blank...
Страница 263: ...Appendix A Drawings A 7 RS 232 Cable Communications Connections 300 9480...
Страница 264: ...A 8 Model 931S Model 932S UV Analyzers Optical Bench Board 100 1662...
Страница 265: ...Appendix A Drawings A 9 PMT Buffer Board 100 0140...
Страница 268: ...S 2 Model 931S Model 932S UV Analyzers This page intentionally left blank...