PN 903-8797, Rev A
Checking the Fuses
Verify that the installed fuses are correct for the operating voltage, and com-
pare them to the fuse holders within the Electronics Enclosure (individually
labeled). At the front of each fuse holder on the upper side is a tab that proj-
ects upwards. To access the fuses, pull the tab outward.
After checking and replacing the fuse, close the fuse tab, pressing it firmly to
ensure it is fully closed.
These fuse ratings are necessary to maintain certification. For ordering
information, see “Spare Analyzer Fuses” in Chapter 4.
See Fuse Ratings table
in Figure 2-3.
Installation and Start-Up
|
2-17
Содержание 241CE II
Страница 14: ...PN 903 8797 Rev A This page intentionally left blank xiv 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 19: ...PN 903 8797 Rev A Figure 1 3 Measuring Cell Assembly cutaway view Overview 1 5...
Страница 24: ...PN 903 8797 Rev A This page intentionally left blank 1 10 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 32: ...PN 903 8797 Rev A Figure 2 1 Analyzer backpan mounting details 2 8 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 66: ...PN 903 8797 Rev A This page intentionally left blank 2 42 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 120: ...PN 903 8797 Rev A Figure 4 3 Window Push button assembly details 4 32 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 143: ...PN 903 8797 Rev A Figure 4 6 Measuring Cell Assembly components Maintenance and Troubleshooting 4 55...
Страница 150: ...PN 903 8797 Rev A This page intentionally left blank 5 6 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 164: ...PN 903 8797 Rev A Analyzer Block Diagram WX 241CE II 1 B 2 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 165: ...PN 903 8797 Rev A Digital Communications Wiring Diagram WX 241CE II 5 Appendix B B 3...
Страница 170: ...PN 903 8797 Rev A This page intentionally left blank B 8 241CE II Hydrocarbon Dewpoint Analyzer...