PN 903-8797, Rev A
6. After ensuring that all connections are made and secure, perform a leak
check on all of the Filterblock’s tubing connections and a high pressure
flow rate test on the Filterblock Assembly to ensure there are no leaks. See
“Sample System Leak Check” in Chapter 2.
If a gas leak is detected, repair and retest the fittings until all leaks have
been eliminated.
7. Close all doors and covers (if they were opened) and secure them with
their screws. Tighten the screws to appropriate specifications.
The torque needed to fasten M10 screws on the Electronics Enclosure
is 9.0 Nm, ±0.7 Nm (80 in.-lb, ±9 in.-lb).
8. Turn on the AC power to the analyzer. After retrieving the configuration
data from the EEPROM, the analyzer will immediately begin operation. The
Run Time is reset to zero.
9. Reset the Mirror Low setpoint temperature (
MTLo
) and the purging time
(
Purge
) to their normal (original) operating values.
The results obtained by the first few measuring cycles are usually
slightly too low (invalid) due to contamination. This can be caused by
the residual water remaining from the cleaning (after maintenance)
and/or exposure of the sample system to the atmosphere – i.e., diluted
with residual air after installation or maintenance.
Depending on the degree of contamination and the purging duration,
the number of measuring cycles required to obtain valid results can
vary. Typically, five measuring cycles will be sufficient to remove the
water or air contaminants after the sample system has been exposed
to water or the atmosphere.
Maintenance and Troubleshooting | 4-13
Содержание 241CE II
Страница 14: ...PN 903 8797 Rev A This page intentionally left blank xiv 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 19: ...PN 903 8797 Rev A Figure 1 3 Measuring Cell Assembly cutaway view Overview 1 5...
Страница 24: ...PN 903 8797 Rev A This page intentionally left blank 1 10 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 32: ...PN 903 8797 Rev A Figure 2 1 Analyzer backpan mounting details 2 8 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 66: ...PN 903 8797 Rev A This page intentionally left blank 2 42 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 120: ...PN 903 8797 Rev A Figure 4 3 Window Push button assembly details 4 32 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 143: ...PN 903 8797 Rev A Figure 4 6 Measuring Cell Assembly components Maintenance and Troubleshooting 4 55...
Страница 150: ...PN 903 8797 Rev A This page intentionally left blank 5 6 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 164: ...PN 903 8797 Rev A Analyzer Block Diagram WX 241CE II 1 B 2 241CE II Hydrocarbon Dewpoint Analyzer...
Страница 165: ...PN 903 8797 Rev A Digital Communications Wiring Diagram WX 241CE II 5 Appendix B B 3...
Страница 170: ...PN 903 8797 Rev A This page intentionally left blank B 8 241CE II Hydrocarbon Dewpoint Analyzer...