STRATOS VERTICAL PLATFORM LIFTS:
Install Manual
04DEC2020 | 630-00147 REV A
17
INSTALLATION
STRATOS: SECTION 4
Figure 4-9
DOORS / GATES BY OTHERS
Interlocks and Strikes to be installed into doors by
others are shipped with VPL in the OEM packaging.
Install devices per instructions in packaging.
Connect wiring per device instructions and
wiring schematic. For details, please refer to the
supplemental guide "Stratos Wiring Schematics".
NOTE: A wiring diagram with part number 640-00025 is
placed in a packet with your shipment.
CALL STATIONS
Call stations are required by ASME 18.1 to be
mounted 15" to 48" off the floor surface. Check your
state and local codes (ASME A18.1 and A117.1).
Call stations are able to be mounted on a surface or
flush mounted on a 2-gang outlet box.
1. Remove four (4) label plate screws and label
plate. See Figure 4-10.
Back
Cover
Front
Cover
(4) Cover
Screws
Label Plate
Figure 4-10
2. Remove four (4) cover screws and front cover
from back cover.
3. Determine mounting and wiring method.
Verify applicable code requirements.
4. If using the back cover for a wall mount setup,
cut out the desired knock-out for wire routing.
There are four (4) knockouts on the back
cover. Two (2) on the back surface, one (1) on
the top and one (1) on the bottom.
5. If using a flush mounted setup the back cover
can be discarded.
6. Mount back cover to wall using appropriate
fasteners through four (4) holes in the back
surface of back cover.
7. Route 8-conductor wire from call stations to
top of tower and 6-conductor cable from call
station to interlock or strike in door or gate.
NOTE: All cables must be stripped at points of termination
so cables can be routed in the most convenient manner.
8. Use crimp connectors to make cable
connections in call station per schematic.
9. Install the front cover to back cover or in-wall
outlet box with four (4) cover screws.
Key Lock
(optional)