Step 1: Verify the job-site requirements.
A.
Make sure the slab is leveled (if not we’ll have to shim the tower)
B.
Make sure the protection wall (fascia panel) is level and flush with the edge of the landing
(No pinch points)
Electrical: 120v/20a outlet (do not connect supply through the GFCI outlet)
Concrete slab 5 x 7 x 5’’
Protection wall / flush – smooth / no pinch points