Step 14: Final placement of the tower
A.
Refer to local codes to determine the gap space between the end of the platform and
the edge of the top landing. (Standardly will be with in ¾ of an inch from the landing wall)
Step 15: Level the tower
A.
Use a level and shims to level the tower (we supply stainless steel shims in the installation kit)
B.
Check the platform, both legs and both sides of the tower to ensure it is leveled.
C.
After leveling double check the platform gap (running clearance) to be sure it has not moved.
Adjust if necessary.
16
Содержание Hercules 750 Residential
Страница 1: ...Vertical Platform Lift Installation Guide ...
Страница 25: ...5110 Atlantic Ave Raleigh NC 27616 AmeriGlide com ...