Step 21: Attach the folding ramp
control arm and the ramp
A.
Then move platform to ensure it
functions properly. Make any
adjustments
necessary.
B.
Be careful not to put weight on it while
it is folding. It’ll brake it.
Step 22: Install facade
panel (tower front wall)
and top cover
A.
Plug into the 3-pin quick
connector (see right for the
platform panel box)
Scan to watch!
more videos can be found at
youtube.com/ameriglide
Folding Ramp
Adjustment
(2 minutes)
21
Содержание Hercules 750 Residential
Страница 1: ...Vertical Platform Lift Installation Guide ...
Страница 25: ...5110 Atlantic Ave Raleigh NC 27616 AmeriGlide com ...