018_VPL Install Training_0121
Table of Contents
Disclaimers and Important Information
.................................................................................................................................
Prepare Your Tool Bag
.................................................................................................................................................................
Installing your Vertical Platform Lift
........................................................................................................................................
Step 1: Verify Job Requirements .....................................................................................................................................
Job Site Preparation ..........................................................................................................................................................
Step 2: Inspect the Crate ..................................................................................................................................................
Step 3: Position the Platform Tower ..............................................................................................................................
Step 4: Remove the Shipping Blocks and Fasteners ...................................................................................................
Step 5: Attach the Car Sling to the Tower ......................................................................................................................
Step 6: Secure the Travel Cable and the Underpan Cable .........................................................................................
Step 7: Lift the Car Sling and Tighten Bolts ...................................................................................................................
Step 8: Install the Platform Floor ....................................................................................................................................
Step 9: Connect the Batteries ..........................................................................................................................................
Step 10: Batteries are Wired ............................................................................................................................................
Step 11: Startup Safety Conditions .................................................................................................................................
Step 12: Run the Platform and Verify Function ............................................................................................................
Step 13: Attach the Exterior Wall ....................................................................................................................................
Step 14: Final Placement of the Tower ..........................................................................................................................
Step 15: Level the Tower ..................................................................................................................................................
Step 16: Anchor the Platform to the Concrete Slab ....................................................................................................
Step 17: Set the Upper and Lower Landing Switches .................................................................................................
Step 18: Install and Wire Call Stations ...........................................................................................................................
Step 19: Install and Wire the Upper Landing Gate ......................................................................................................
Step 20: Adjust the Interlock ............................................................................................................................................
Step 21: Attach Folding Ramp Control Arm and Ramp ..............................................................................................
Step 22: Install Facade Panel ...........................................................................................................................................
Step 23: Attach COP into the Interior Guard Panel .....................................................................................................
Step 24: Attach the Underpan Under the Platform ....................................................................................................
Step 25: Attach All Stickers / Labels ................................................................................................................................
Step 26: Instruct the Customer on Safe Operation of the Lift ...................................................................................
2
6
8
8
8
9
10
10
11
12
12
12
13
14
14
15
15
16
16
17
18
18
19
20
21
21
22
22
23
23
018_VPL Install Training Guide_AMG__1222
Содержание Hercules 750 Residential
Страница 1: ...Vertical Platform Lift Installation Guide ...
Страница 25: ...5110 Atlantic Ave Raleigh NC 27616 AmeriGlide com ...