Step 10: Once the batteries are wired
A.
Plug in the platform power plug, make sure all emergency stops are pulled (COP & side
of tower), make sure call stations and COP keys are turned on and the platform should
now move up and down.
Step 11: If the platform does not move:
Perform the startup (safety) conditions
A.
Follow the startup condition points, and when the
voltage drops, that’s where your problem is.
B.
QR code to access the troubleshooting guide
(side of the tower).
Scan to watch!
more videos can be found at
youtube.com/ameriglide
Checking the Safety
Pan Circuit
(4 minutes)
VPL
Troubleshooting
Guide
Scan to read!
Tools Required
P1 Accessing
Internal Components
P2 Testing Main Fuse
P3 Testing the Breaker
P4 Testing Limit
Switch Connections
0:10
0:20
2:35
4:00
5:09
P5 F.O. Switch Connections
P6 Emergency Stop
P7 i1 Jumper Voltage
P8 Gate Interlock
and Usage
P9 Safety Pan Circuit
5:48
7:21
9:35
10:18
11:56
Time Stamp for Checking the Safety Pan Circuit
14
Содержание Hercules 750 Residential
Страница 1: ...Vertical Platform Lift Installation Guide ...
Страница 25: ...5110 Atlantic Ave Raleigh NC 27616 AmeriGlide com ...