Step 17: Set the upper and lower landing switches
A.
Platform must stop on the limit switches for both top and bottom
landing. That’s what unlock the gates / interlocks.
Step 18: Install and wire call stations
A.
Plug into the
3-pin quick
connector
(see right for
the
platform
panel
box)
more videos can be found at
youtube.com/ameriglide
Upper Landing
Switch Adjustment
(2 minutes)
B.
pass the wires
inside
the
conductors.
This protects the
wires and avoid
potential
shorts.
more videos can be found at
youtube.com/ameriglide
Install Lower
Landing Call Station
(7:20 - 7:45)
18
Scan to watch!
Scan to watch!
Содержание Hercules 750 Residential
Страница 1: ...Vertical Platform Lift Installation Guide ...
Страница 25: ...5110 Atlantic Ave Raleigh NC 27616 AmeriGlide com ...